Feedback
Call Us: +91-9818247705


Summit

  • Project Logo
  • Perspective View
  • Perspective View
  • Location map
  • Site Plan
  • Layout-Corner.
  • Layout-Special
  • Layout-Standard

Introduction

Discover the essence of sheer luxury, capture the myriad flavors of a modern lifestyle. Give in to the aesthetics of a contemporary architectural masterpiece. Welcome to the Summit, Luxury condominiums designed by India's leading Hafeez Contractor.

The Location:

Visualize the finest expression of royalty in the lap of nature, located at a premium address in Phase V of the DLF City. Spread over 3.5 acres of land this landmark property consists of 3 towers each G+19. With posh neighbors like the Aralias, The Pinnacle, The Icon, Westend Heights, South Point Mall and DLF Golf & Country Club.

Developer:

This project is developed by the DLF, is a group that is fuelled by the winds of change, constantly evolving and innovating to shape the future of real estate backed by half a century of invaluable experience.The DLF group has 21 urban township to its credit, a name synonymous with distinction in building world-class residential colonies, commercial complexes and corporate centers.


  • Project Logo

  • Perspective View

  • Perspective View

Features

• Air-conditioned Apartments
• Elegant wooden laminated flooring
• 100% Power Back up
• Exclusive Club with swimming pool & well-equipped gymnasium.
• Utility balconies attached with Kitchen
• Attached toilets with each bedroom
• Servants room in each apartment with separate entrance
• Structure designed for seismic consideration for ZONE V as per code IS1893, Year 2002
• Round the clock security system
• Well-equipped fire fighting systems with modern day sprinklers

    Specifications


    SRUCTURE

    Designed for seismic consideration for ZONE V as per code IS 1893, Year 2002

     
    Living/ Dining/ Passage/ Lobby
    Floor (within apartments)      Imported marble

    Walls                   Acrylic emulsion with Cornices as per design

    Ceilling                Oil bound distemper
     
    Bedrooms

    Floor                   Wooden laminated flooring with 2" high wooden laminated skirting

    Walls                   Acrylic emulsion with Cornices as per design

    Ceilling                Oil bound distemper
     
    Kitchen

    Walls                   Combination of Ceramic tiles upto 2'-0' above the Counter and oil bound distemper in the balance area

    Floor                   Suitable combination of one or more Indian Marble/Stone/Ceramic Tiles

    Counter              Granite / Marble

    Fitting / Fixtures         Superior quality CP Fittings, Stainless steel double Bowl/Single Drain Board Kitchen Sink, Exhaust Fan

     
    Toilets

    Walls                   Combination of Ceramic Tiles upto 7'-0', Oil Bound Distemper and Mirror

    Floor                   Suitable combination of one or more Indian Marble/Stone/Ceramic Tiles

    Counters             Granite/Marble

    Fittings/Fixtures Jaquar make or equivalent superior quality single Lever CP fittings, Chinaware (Neycer / Parryware / Hindware or equivalent) Ess Ess make or equivalent. Towel Rait/Ring, Soap Dish, Toilet Paper Holder and Coat Hook in Toilets

    Toilet Shower Enclosure        Shower Curtain Rail with Shower Curtain
     
    Balcony
    Floor                   Terrazo
    Ceilling                Exterior Paint
    S. Room and S. Room Toilet
    Floor                   Terrazo

    Walls                   Combination of Ceramic Tiles and Oil Bound Distemper

    Ceillings              Oil Bound Distemper
     
    Doors

    Internal Door    :  Polished/Painted Hardwood frames with Polished Painted Moulded Skin / Flush Shutters

    Entrance Door   : Teak Veenered and Polished Flush Shutter / Moulded Skin Door

    EXternal Doors & Windows Hardware   :         Powder Coated / Anodised Aluminium Glazings Brass Hardware except for S. Room & S. Room Toilet

    Electricals    :   MK make or equivalent Modular Switched and Sockets, Copper Wiring (fittings like fans, light fixtures, geysers, applicances etc. not provided)

    Backup power of 10KVA per apartment

    Security System  :       Access cards for the residents for entry into the Entrance lobby at ground level and lift lobby in Basement, CCTV in basement & main entrance Lobby for surveillance

    Plumbing       :      Copper Piping for water supply inside toilets and kitchen. Sprinkler system for fire safety in all areas as per norms Water softening plant

    Club Facility   :    Party Room, Switching Pool, Change Rooms and Gymnasium

                                
    Note:-                 
    • Brand and make are indicative and will be of equivalent make & quality as per availability.
    • Marble and granite being natural material have inherent characteristics of colour and grain variation.
    • All floor plans, layout plans and specification are indicative and are subject to change as decided by the company or competent Authority
    • In case of non-availability of imported laminated/ imported marble flooring material equivalent quality Indian substitutes will be used.
    • All internal walls may be of gypsum board, in place of conventional brick work, for better aesthetics, finish and to provide flexilility formodifications.

      Price and Payment Plan

      3 Towers of G+19 stories with only 4 apartments on each floor.
      Each tower has high-speed elevators.
      Air-conditioned provided in apartments**

      Apartment
      Type
      Area (sq. Ft.)
      Price (in thousands)
      INR
       

      Special (Floor Plan)

      4 BR + Study
      3500
      As Applicable

      Corner (Floor Plan)

      4 BR + Study
      3300
      As Applicable

      Standard (Floor Plan)

      4 BR + Study
      2950
      As Applicable

      * The area mentioned are super built-up area.
      Additional cost for Legal Charges, Maintenance, etc as applicable.
      *Conversion rate applicable as on date of payment.
      ** Apartments are also available without air-condition at a lower rate.

      Payment Schedule
      Payment Type
      Percentage Of Payment (approx)
       
       
      On booking
      15%
      Within 2 months
      10%
      Within 4 months
      10%
      Within 6 months
      7.5%
      Within 9 months
      7.5%
      Within 12 months
      7.5%
      Within 15 months
      7.5%
      Within 18 months
      7.5%
      Within 21 months
      10%
      Within 24 months
      10%
      On application for Occupation Certificate
      5%
      On receipt of Occupation Certificate
      2.5%

      *The above Payment Schedule is on the basis of the construction status as on September 2005.

        Location Map


        • Location map

        • Site Plan

        Layout Plan


        • Layout-Corner.

        • Layout-Special

        • Layout-Standard

        Send Query

        Your Name:
        Your Email:
        Mobile No.:
        Your Query:
        Calculate:

        Comments

        Other Projects of DLF

        By vayaM CS