Feedback
Call Us: +91-9818247705


Vatika Business Park, Gurgaon

  •  BLOCK Three Third Floor
  • Block One Second Floor
  • Block One Ground Floor
  • BlockTwo Ground Floor
  • Block Three Ground Floor
  • Block-Two-Second-Floor
  • Vatika Business Park, Gurgaon
  • Vatika Business Park, Gurgaon

Introduction

Vatika Business Park consists of over 8,70,000 sq. ft. of office space. The complex boasts of a one-acre central landscaped courtyard/piazza – its three building blocks are configured around this. In addition to this, a specially designed “Bean Garden” provides welcome aesthetic relief.

Corporate retail, restaurants, food-courts, ATMs, a cafeteria, training rooms, and a health club will comprise a 360-degree experience to the approximately 11,000 professionals working at Vatika Business Park.

    Specifications

    Plot Area 6.88 acres
    Green Belt Area 1.39 acres

    Central Chilled Water type with combination of Screw Chiller and Centrifugal chiller

     adequate no.s of Floor Mounted/Ceiling suspended AHU units on each office floor,

    Thermal storage to meet peak load, Heat Recovery Units/ Ozonizer to reduce the plant capacity by 15%.

    Number of Floors

    Block One Ground + Eight Floors
    Block Two Ground + Fourteen Floors
    Block Three  
    Ground + Eight Floors
    Three Level Basements  

    HVAC Plant Capacity

     

    Centralized HVAC plant 2900 TR (400 TR x 3nos. Screw chillers + 850 TR x 2 nos. Centrifugal Chillers)

    equivalent plus 8000 TR/Hr Thermal storage.

    Floor to Floor Height

    Ground Floor 4.50 m
    Typical Floor  
    3.75 m
    First Basement 4.20 m
    Second & Third Basements 3.75 m

    Piping and Ductwork

    Chilled Water piping from A.C. Plant to Air Handling units, Common link area

    complete with ducting and grills, Ductwork from Air Handling Units capped off at tenant’s

    areas with fire dampers. adequate Floor Mounted/Ceiling suspended AHU units per floor

    are planned, Ducting with fire dampers up to AHU room walls in Vatika scope & rest in client’s scope.

    Elevators

    Block One 6 nos. 16 pax Passenger Elevators, 1 no. Service Elevator
    Block Two 9 nos. 20 pax Passenger Elevators, 1 no. Service Elevator, 2 nos. Escalators for Retail Area
    Block Three 5 nos. 16 pax Passenger Elevators, 1 no. Service Elevator

    BMS and Controls

     

     

    Hands free operation and monitoring the principle operations of the building control system fully integrated with the security, fire alarm and lift control systems.

    Other Features

    Food Court, Restaurants, Health Centre, Training Rooms and Retail Outlets/ ATMs Independent access to each block Landscaped central piazza

    Ventilation and Exhaust

    Provided for toilets, cores and basements, Separate ventilation for DG Room with air-cooling for increased efficiency.

    Structural System

    Foundation Isolated foundations
    Floor Slab 275mm thick flat slab with drop panels of 450 mm thickness
    Typical Column Sizes 750 mm Dia , 900mm Dia,1000mm Dia, 1150mm Dia

    Plumbing

    Sanitary Fittings:
    Low volume flushing EWC (4-6 liters) with concealed flush valves; Self closing type taps in wash basins

    Water Treatment:
    Filtration plant for flushing water; Filtration and softening plant for soft water supply to cooling tower make-up and domestic water supply.

    Soil, Waste And Vent Pipes:
    Two pipe vented system to be used in toilets; All vertical pipes to be in accessible shafts;

    Plant room:
    At lower basement level housing all water supply pumps and water filtration and softening equipment.

    Sewerage:
    Building sewer to be connected to STP (650 kilolitres). The recycled water from STP to be used for flushing, horticulture & HVAC/DG coating tower make up. Excess recycled water shall be discharged in municipal sewer.

    Storm Water Drainage:
    All roof water shall be collected in underground lines and discharged in underground aquifer by use of detention tank and recharge well; All surface water to be recharged by soak pits. Total rainwater harvesting scheme planned.
    HSD Bulk Oil Storage Tanks:
    An underground HSD oil storage tank of 2x20KL is planned for storage of High Speed Diesel for DG sets. The oil tank yard shall be barricaded as per CCE norms.

    Finishes

    External Cladding 6 nos. 16 pax Passenger Elevators, 1 no. Service Elevator
    Tenant Floor Finish 75mm clearance left
    Basements Floor Finish - Concrete with non-metallic floor hardener
    Main Lift Lobby Wall Finish - Tiles, Floor Finish - Tiles, Ceiling - Gypsum
    Service Lift Lobby Wall Finish - Tiles, Floor Finish - Stone, Ceiling - Gypsum
    Toilets Wall Finish - Tiles, Floor Finish - Tiles, Ceiling - Gypsum, Urinal \ WC Partitions - Laminate Partition
    Main Staircase Floor Finish - Granite, Skirting - Granite, Wall Finish - Enamel Paint,
    Service Staircase Floor Finish - Stone, Skirting - Stone, Wall Finish - Enamel Paint

     

    Electrical

     

    Power Supply:
    Power supply made available from DHBVNL at 33KV supply system.

    Sub-Station:
    11Kv Outdoor type sub-station isolated from main building complex with 4 no 2500 KVA Transformer and HT control through 11KV HT vacuum circuit breaker.

    Power conditioning:
    Power conditioning is carried out at HT end. AVR is provided to cater to voltage fluctuation in the system voltage

    LV Switchgear:
    LV Switchgear used in the installation conforms to IEC specifications as well as international standards.

    LT Distribution:
    LT distribution for all users to be carried out through Bus Duct Risers obtained from reputed manufacturer; Four sets of bus duct risers have been used to provide proper load distribution in the complex.

    Load Available for User:
    System has been planned to provide adequate load for Lighting; Small Power & UPS needs of each user keeping in mind computer requirements; In addition to the maximum demand load on each floor; adequate arrangement has been made for critical needs like Server Room load as well as its air-conditioning required for night hours.

    Critical / Emergency Lighting:
    Emergency lighting has been provided for all Common areas, Staircases, Escape Routes and Lift Lobby.

    Dedicated Earthing:
    Complete infrastructure (space) has been planned for all users to enable them to provide their own dedicated earthing system for various requirements.
    Back-up Power Supply System:
    100% backup power supply system shall be available in the complex; DG Sets shall be provided with electronic monitoring system, shall be modern engine design with optimized combustion system; Compact and easy to install with low fuel consumption resulting in reduced operating costs; 6 nos. 1500 KVA DG sets shall be used to provide backup power for the entire maximum demand load of the complex and these shall be PLC based auto synchronized, auto load sharing and auto load management; Adequate diesel storage capacity has been planned to provide operation of standby DG Sets for at least 48 hours.

    Parking

    Total Parking 1073 cars
    Bay size 5.5m x 2.5m wide bays for each car

    Security

    CCTV Cameras In all basements, lift lobbies of Ground Floor and at the entry/exit of ramps
    Security 24 hour manned security at all common areas of the complex including outside
    Access Control Control barrier with electronic proximity cards at ramp entrances.

    Communication

     

     

    Provision for Communication System
    Along with necessary P & T lines for each user, infrastructure facilities have been provided to receive various communication links as well as broad band fiber optic cables etc.

     

    Fire Fighting

    Staircase One main staircase and one fire escape staircase in each block
    Travel Distance Maximum travel distance 45m
    Wet riser/ Hose Reels Adjacent to each staircase
    Yard Hydrants Provided at ground level as per NBC norms.
    Hand-held Extinguishers Provided as required in landlord's areas
    Fire Fighting Pumps 2 nos. main fire electric pumps, Cap. 2850 lpm, 110 m head
    2 nos. fire jockey pumps, Cap. 180 lpm, 110 m head
    1 no. Common diesel engine driven stand by pump, Cap. 2850 lpm, 110m head

    Landscaping

     

     

     

     

     


    Roadways & Surface Parking
    Heavy Duty Precast concrete Pavers in main drive way and drop off

    Pedestrian and Roadway Lighting
    Pole mounted fixtures and custom designed bollard lighting

    Site Landscape
    Granite and standstone paving in different finishes on plaza; One acre front park and large rear garden with trees, ground cover.

    Tanks

    Underground (Basement)

    Fire Water tank 200 Kilolitres
    Raw Water tank 320 Kilolitres
    Filtered water tank 564 Kilolitres
    Soft water Tank
    130 Kilolitres


     

    Terrace Level Water Storage

    Block One  
    Fire Tank 20 Kilolitres
    Flushing Tank 25 Kilolitres
    Filtered water tank 35 Kilolitres
    Block Two  
    Fire Tank 20 Kilolitres
    Flushing Tank 30 Kilolitres
    Filtered water tank 45 Kilolitres
    Block Three  
    Fire Tank 20 Kilolitres
    Flushing Tank 15 Kilolitres
    Filtered water tank 25 Kilolitres

    Fire Alarm System

    • Hybrid Fire alarm system with Addressable main fire alarm panel located in Security & Fire Control Room on Ground Level along with repeater Panel in Security room.
    • Adequate provision for installation of addressable or conventional fire alarm devices / panels at all levels for tenants requirements.

      Facilities

      Security

      Closed circuit television cameras (CCTVs) located in the main entrance, main lift lobby, the service entrance and the first basement lift lobby ensure that your security needs are more than well cared for. The CCTVs are monitored from a multiplex central station, and facilities include pan, tilt, zoom and recording. This is supplemented by strategically positioned manned round-the-clock security and access control through control barriers with electronic proximity cards at ramp entrances

      Power supply with 100% Backup

      Power supply shall be made available from DHBVNL at 11KV supply system. The complex will also have its own 11KV outdoor-type sub-station isolated from main building complex with two 2000 KVA transformers and HT control through 11KV HT vacuum circuit breaker. In addition to the maximum demand load on each floor, adequate arrangements have been made for critical needs like Server Room load as well as its air-conditioning required for night hours.

      Climate Control
      Central Chilled Water air-conditioning with a combination of Screw Chiller and Centrifugal chiller with two Air Handling Units on each office floor. Thermal storage to meet peak load. Extra cooling towers to run devices such as servers, UPS etc will also be provided.
      Communications
      Along with necessary P & T lines for each user, infrastructure facilities have been provided to receive various communication links as well as broad band fiber optic cables etc. Structural provision has also been made on the roof top to enable each user to install V-SAT antennas as well as satellite dishes for their communication requirements.
      Fire
      The buildings have one main and one fire staircase for safe egress in case of fire. Hose reels are adjacent to each staircase with sprinkler systems fitted in all common areas and basements.

        Floor plans

        Vatika Business Park, Gurgaon


        • BLOCK Three Third Floor

        • Block One Second Floor

        • Block One Ground Floor

        • BlockTwo Ground Floor

        • Block Three Ground Floor

        • Block-Two-Second-Floor

        • Vatika Business Park, Gurgaon

        Location Map

        Vatika Business Park, Gurgaon


        • Vatika Business Park, Gurgaon

        Send Query

        Your Name:
        Your Email:
        Mobile No.:
        Your Query:
        Calculate:

        Comments

        Other Projects of VATIKA GROUP

        Similar Projects

        By vayaM CS