Introduction

Introducing "Spaze Business Park", the new icon of business world! It's an integrated business hub taking the concept of the corporate office beyond four walls. Comprising of two independent towers of six and eight floors, the first to the top floors are meant for the offices while the ground floor has been designed for Retails, Restaurants, Health Club, Banks, ATMs and more. Spaze Business Park perfectly complements an impressive corporate stature!

    Features

    • Spread over approx. 2.5 acres and offering approx. 2,75,000 sq ft of premium office and retail spaces
    • Two independent towers of six and eight floors
    • Entrance through a breath-taking double height Atrium
    • Ground floor dedicated to Retail, Luxury stores, Banks, ATMs, Restaurants, Café, Health Club etc
    • First floor onwards exclusive for offices and corporate suites
    • World-class landscaping by international consultants
    • Multi-level car parking in basements and ample surface parking for visitors
    • Climate control with centrally chilled water, air-conditioning with AHU’s on each floor
    • Common wet area on each floor
    • CCTVs at entry points and lifts, 24 hour manned surveillance and access barriers
    • 100% power back-up
    • Self integrated commercial park

      Payment Plan

      PAYMENT SCHEDULE

      On Booking 20% of the BSP
      On Excavation 7.5 % of BSP
      On Casting of 2nd Basement Floor Slab 7.5 %  of BSP+ 25% of EDC and IDC
      On Casting of 1st Basement Floor Slab 7.5 %  of BSP+ 25% of EDC and IDC
      On Casting of Ground Floor Slab 7.5 %  of BSP+ 25% of EDC and IDC
      On Casting of 2nd  Floor Slab 7.5 %  of BSP+ 25% of EDC and IDC
      On Casting of 4th Floor Slab 7.5 % of BSP
      On Casting of 6th Floor Slab 7.5 % of BSP + 25% of Car Parking
      On Completion of superstructure 7.5 % of BSP + 25% of Car Parking
      On Installation of Plumbing 7.5 % of BSP + 25% of Car Parking
      On Installation of Electrical 7.5 % of BSP + 25% of Car Parking
      On Notice of Possession 5% of BSP + other applicable charges
      *The amount to be paid at the time of booking would be applicable as per the status of the construction of relevant Tower of the said unit.

        Floor plans

        Spaze Buziness Park


        • first-floor-plan

        • second-floor-plan

        • Third-floor-plan

        • fourth-floor-plan

        • fifth-floor-plan

        • sixth-floor-plan

        • seventh-floor-plan

        • spaze-business-park

        Site Layout

        Spaze Buziness Park


        • spazebuziness-site-plan

        Location Map

        Spaze Buziness Park


        • Spaze Buziness Park

        Send Query

        Your Name:
        Your Email:
        Mobile No.:
        Your Query:
        Calculate:

        Comments

        Other Projects of Spaze

        Similar Projects

        By vayaM CS